Profile drawing for Flottentorpedoboot 1941

Development

The project

Based on the successful Flottentorpedoboot 1939, the Flottentorpedoboot 1941 was intended to correct the remaining weaknesses of its predecessor. More powerful machinery and additional anti-aircraft armament were planned. Fifteen boats were ordered between 1942 and 1944, but none was completed.

At the end of the war, the launched ships had reached different stages of construction. T37 was closest to completion. Hulls that could still be moved were towed west from Elbing, but construction did not resume.

Construction records

Ordered ships

Fifteen ships were ordered. Six were launched, but none was commissioned.

Construction status and fate of the ordered Flottentorpedoboot 1941 ships
NameConstructionLaunchedCommissionedFate
T37Schichau, Elbing, 194329 April 1944Not commissioned96.5% complete. Towed west on 26 January 1945, taken over by the United States on 8 May 1945 and sunk near Jutland on 26 July 1946.
T38Schichau, Elbing, 194317 June 1944Not commissioned84% complete. Towed west on 26 January 1945 and sunk near Jutland on 10 May 1946.
T39Schichau, Elbing, 194322 July 1944Not commissioned76% complete. Towed west on 26 January 1945 and sunk near Jutland on 10 May 1946.
T40Schichau, Elbing, 19432 September 1944Not commissioned70% complete. Scuttled near Danzig on 23 March 1945.
T41Schichau, Elbing, 194312 September 1944Not commissioned66.5% complete. Scrapped at the shipyard.
T42Schichau, Elbing, 194310 October 1944Not commissioned58.5% complete. Scrapped at the shipyard.
T43Schichau, Elbing, 1943Not launchedNot commissioned48% complete. Scrapped at the shipyard.
T44Schichau, Elbing, 1944Not launchedNot commissioned40% complete. Scrapped at the shipyard.
T45Schichau, Elbing, 1944Not launchedNot commissioned35% complete. Scrapped at the shipyard.
T46Schichau, Elbing, 1944Not launchedNot commissioned26% complete. Scrapped at the shipyard.
T47Schichau, Elbing, 1944Not launchedNot commissioned23% complete. Scrapped at the shipyard.
T48Schichau, Elbing, 1944Not launchedNot commissioned20.5% complete. Scrapped at the shipyard.
T49Schichau, Elbing, 1944Not launchedNot commissioned8.2% complete. Scrapped at the shipyard.
T50Schichau, Elbing, 1944Not launchedNot commissioned5.3% complete. Scrapped at the shipyard.
T51Schichau, Elbing, 1944Not launchedNot commissioned6.5% complete. Scrapped at the shipyard.

Class data

Technical profile

Principal dimensions, armament, machinery and projected performance.

Dimensions

Size (Max)
2190 t
Length (Total)
106,0 m
Length (Waterline)
102,0 m
Beam
10,7 m
Draft
3,72 m
Crew
231

Armament

10,5 cm L/45 C/32
4
3,7 cm L/83 C/30
6
2 cm MG L/65 C/30
8
53,3 cm Torpedo tubes
6
Mines
50-60
Depth Charge launcher
4

Machinery

Shafts
2
Turbines
2
Type
Wagner Type Geared Turbines (Schichau build)

Performance

Total Performance
40000shp
Speed
34 kn
Range
2800 miles at 19 kn