Profile drawing of Graf Spee
35300 tMaximum displacement
223,0 mOverall length
28,8 knMaximum speed
1186Complement

Launched without a future

Named for Admiral Maximilian von Spee, the unfinished battlecruiser embodied lessons from early wartime combat but could not be completed under mounting pressure on German industry.

01

A larger battlecruiser generation

The planned combination of eight 35 cm guns, higher speed and greater range represented a major step beyond the Derfflinger class.

02

A hull awaiting guns and machinery

Launching freed the slipway, yet construction never progressed far enough to produce an operational ship or influence the naval war.

03

The armistice ends the project

With no prospect of completion after the war, the incomplete hull was dismantled during the fleet's postwar reduction.

Design and service

The story of Graf Spee

The Mackensen class represented the culmination of German battlecruiser development during World War I. The ships were enlarged derivatives of the Derfflinger class, with heavier 35 cm guns and improved armor protection.

Although 38 cm guns were initially considered, the resulting increase in displacement and limits imposed by the naval leadership led designers to adopt 35 cm guns instead.

Mackensen alone was ordered in peacetime; six additional ships followed under the emergency wartime construction program. After Germany learned that the British Renown class would carry 38 cm guns, the final three orders were redesigned with weapons of the same caliber, creating the separate Yorck class.

None of the four Mackensen-class ships was completed. Work on Mackensen stopped with about fourteen months remaining, and she was broken up after the war. Prinz Eitel Friedrich was roughly twenty-one months from completion; she was launched only to clear the slipway and was then scrapped. Graf Spee was an estimated twelve to eighteen months from completion when work ended. Fürst Bismarck was the least advanced ship of the class, was never launched and was dismantled on the slipway by 1922.

At a glance

Technical profile

Dimensions, armament, protection and performance.

Dimensions

Size (Max)
35300 t
Length (Total)
223,0 m
Beam
30,4 m
Draft
9,3 m
Crew
1186

Armament

35 cm L/50
8
15 cm L/45
14
8,8 cm
8
60cm torpedo tubes
5

Armor

Deck
30 mm
Belt
300 mm
Command Tower
350 mm
Turrets
320 mm

Machinery

Shafts
4
Turbines
4
Type
2 Marine & 2 Marsch

Performance

Total Performance
90000 shp
Speed
28,8 kn
Range
8000 sm at 14 kn

Construction record

Graf Spee

Laid down
Schichau, Danzig, 30.11.1915
Launched
15.09.1917
Commissioned
never completed, construction stopped on 17.11.1918, 12-18 monthes before completion
Fate
scrapped 1921-1923