Because of the Christmas holidays, the construction yard was empty for some days, all workers were away ... :) So contruction only progressed very slowly in the last two weeks.
After the timber heads were cut and sanded to the correct length, the rod castings were added to the paddle wheel cover. The gap between both was filled with putty and the rod casting sides - which were added in earlier construction steps - were shortend to the correct length.
|