Profile drawing of Stettin
3822 tMaximum displacement
117,4 mOverall length
25,2 knMaximum speed
322Complement

A versatile cruiser through changing roles

Stettin turned the Stettin-class design into a distinct career shaped by the Imperial Navy's changing peacetime and wartime demands.

01

The turbine transition begins

Four related cruisers introduced evolving machinery arrangements while retaining the established 10.5 cm battery and worldwide utility.

02

She joined prewar overseas deployments

She joined prewar overseas deployments, fought at Heligoland Bight and Jutland and finished the war in secondary service.

03

The last chapter in 1920

Stettin: delivered to England in 1920.

The full story

History of Stettin

The small cruisers of the Stettin class were very similar to their predecessors, the Bremen class. There was only a slight increase in size and engine performance, but this did not lead to a higher top speed. The obvious difference to the older ships was a increased space between the second and third funnel. This ships show a different philosophy than its British counterparts - while German small cruiser had a large number of relatively small guns (10 - and later ship classes had even more), the British favored lesser, but bigger guns (15,2 cm instead of 10,5 cm ones).

Stettin was used for fleet service and took part in the Battle of Helgoland which was fought with small cruisers, torpedo boats and destroyers. It also participated in the Battle of Jutland as flagship of the 4th reconnaissance group. From 1917 on it was used in the submarine school and it was projected to rebuild it as an seaplane carrier like the Stuttgart, but this was stopped by the end of the war. Like its sister ship, the Stettin was delivered to England and scrapped in 1920.

At a glance

Technical profile

Dimensions, armament, protection and performance.

Dimensions

Size (Max)
3822 t
Length (Total)
117,4 m
Length (Waterline)
116,8 m
Beam
13,3 m
Draft
5,14 m
Crew
322

Armament

10,5 cm
10
5,2 cm
8
45 cm Torpedo tubes
2

Armor

Deck
50 mm (max)

Machinery

Shafts
2
Turbines
2
Type
Parsons

Performance

Total Performance
21670 shp
Speed
25,2 kn
Range
4170 miles as 12 kn

Construction record

Stettin

Laid down
AG Vulcan Stettin, 1906
Launched
07.03.1907
Commissioned
29.07.1907
Fate
Delivered to England in 1920